142 RSLogix 5000 Add-On Instruction
If the selected AOI instance tag does not have the same
parameters as the fuzzy project in FuzzyDesigner and only the
project structures are the same, the following dialog is shown.
This can happen if you have changed some parameters off-line,
for example, the membership function position.
If communication is successfully established, the following
window appears.
4. Start monitoring by clicking on the Run Monitoring
icon.
The On-line Connection Panel offers the following functionality:
• If you want to change the monitoring period, click the
Change Monitoring Period
icon.