Rockwell Automation FactoryTalk View Site Edition Installation Guide User Manual
Page 124

F
ACTORY
T
ALK
V
IEW
I
NSTALLATION
G
UIDE
110
• •
•
•
•
Part 2: Set up a temporary system and perform a partial upgrade
During Part 2 of the upgrade, a temporary system is set up to test a partial upgrade that
involves Server # 2 (the secondary server), Workstation #1, and selected run-time clients.
For the test, Server #2 is set up to function as the primary server.
First, set up Server #2 as the
Network Directory and primary
HMI and data server (without
redundancy). Then, upgrade the
software on Server #2.
Next, upgrade the software
components on Workstation #1,
and then, migrate the restored
application.
Server #2
Workstation #1
Part 2: Server #2, Workstation #1, run-time clients
Run-time clients
Finally, upgrade the software
components on some run-
time clients only, and then
test the partial upgrade.
Server #1
Remaining
clients
FTViewSEInstallENU.book Page 110 Wednesday, July 16, 2014 10:53 AM