03 sequence of operation, Cutmaster 42 operation – Tweco 42 CutMaster Service Manual User Manual

Page 30

Advertising
background image

CUTMASTER 42 OPERATION

Operation 4-4 Manual 0-5171

G. Select Current Output Level

Set the desired current output level.

A

120V 15A

120V 20A

230V 20A

24

40

20

20

30

27

120V, 15A

24

40

20

20

30

27

24

40

440

20

20

30

7

277

00

230V, 20A

24

20

27

24

20

7

27

40

20

30

A

4

30

120V, 20A

40

20

30

30

30

30

A

24

40

440

20

20

7

277

A

24

2

A

4

22

0

40

20

30

24

20

A

A

A

27

A#09697_AA

4.03 Sequence of Operation

The following is a typical sequence of operation for this power supply.

1. Place the ON / OFF switch on the power supply to ON (up) position (Red indicator lamp is illuminated).

a. AC indicator

turns on; fan turns on.

NOTE

During initial power up, there will be a delay of about 2 seconds before the AC Indicator light will illuminate

and the pre-flow gas and fan starts. The gas will automatically flow from torch for approximately 10 seconds

(only after the AC Indicator lamp is illuminated) (The AC Indicator lamp and fan turns on approximately 2

seconds after the ON/OFF switch is enabled), this is a process that makes sure all inputs (gas, input power,

torch connection, and torch parts) are acknowledged for proper operation.

2. Wear protective clothing, including welding gloves and appropriate eye protection (see table 1-1). Place tip on

work piece and pull trigger. Arc will initiate and start cutting material.

Advertising