02 installing back panel, Cutmaster 42 assembly procedures – Tweco 42 CutMaster Service Manual User Manual
Page 66
Advertising
Assembly Procedures 8-2 Manual 0-5171
CUTMASTER 42
ASSEMBLY PROCEDURES
8.02 Installing Back Panel
1. Install gas inlet.
2. Install ON/OFF switch
3. Install wire cord.
4. Reconnect Input Wire on the ON/OFF switch.
5. Install fan.
6. Install ground wire.
7. Reconnect AC Input wire on Main Power PCB to power ON/OFF switch.
8. Reconnect the three screws.
9. Reconnect Rear Panel screws.
1
5
2
4
3
Art # A-10257
6
9
Advertising