Tweco 200 Ultra-Cut User Manual

Page 65

Advertising
background image

Manual No. 0-5056 Ultra-Cut 200

3-41

INSTALLATION

NOTE

Depending on the length of the torch leads, the system may require more coolant after turning the
system ON for the first time.

a. Place the ON/OFF Switch to ON.

b. After about 30 seconds the system may shut down if the leads are not full of coolant.

c. Place the ON/OFF switch to OFF.

d. After 10 seconds place the ON/OFF switch to ON again.

e. Repeat steps ‘b’ through ‘d’ until the system no longer shuts down. Depending on the length of the torch

leads this sequence may need to be done three to five times.

f.

After the system stays operational allow the pump to operate for ten minutes to properly purge any air
from the coolant lines before using the system.

3. Re-fill the reservoir and re-install the filler cap.

4. Purge coolant from the torch before firing the torch. Ensure there are no leaks before use. If leaks are

evident, consult the coolant leak trouble-shooting guide in the maintenance section of this manual.

Advertising