AERCO RECON 1000 User Manual

Page 51

Advertising
background image

RECON Water Heaters Installation, Operation & Maintenance Manual

CHAPTER 3 – OPERATION

OMM-0103_0A

AERCO International, Inc.

 100 Oritani Dr.  Blauvelt, NY 10913

Page 51 of 178

GF-147

Phone: 800-526-0288 PRI:

10/28/2014

Start Sequence

1. The DEMAND LED status indicator will light.
2. The unit checks to ensure that the Proof of Closure (POC) switch in the downstream Safety

Shut-Off Valve (SSOV) is closed. See Figure 3-3 for SSOV location.

Figure 3-3: Gas Train and SSOV Location (RECON 1000 Shown)

3. With all required safety device switches closed, a purge cycle will be initiated and the

following events will occur:

(a)

The Blower relay energizes and turns on blower.

(b)

The Air/Fuel Valve rotates to the full-open purge position and closes purge
position switch. The dial on the Air/Fuel Valve (Figure 3-4) will read 100 to
indicate that it is full-open (100%).

(c)

The VALVE POSITION bargraph on the C-More controller will show 100%.

Figure 3-4: Air/Fuel Valve in Purge Position

STEPPER
MOTOR

TO
BLOWER

PURGE

VALVE POSITION

DIAL AT 100%

GAS INLET

MANUAL

SHUTOFF

VALVE

AIR IN

SSOV

TO AIR/FUEL

VALVE

Advertising
This manual is related to the following products: