Switch installation, Switch rear panel, Desktop/shelf installation – Interlogix GE-DS-242-PoE User Manual

Page 19

Advertising
background image

Chapter 2: Installation

GE-DS-242-PoE Managed Ethernet Switch User Manual

15

Switch Rear Panel

The rear panel of the Managed Switch includes an AC inlet power socket, which
accepts input power from 100 to 240VAC, 50-60 Hz. Figure 2-3 shows the rear
panel of the Managed Switch.

Figure 2-3: GE-DS-242-PoE Rear panel

2

3

POWER NOTICE:

1. The Managed Switch is a power-required device: it will not work unless it is

receiving power. If your networks must be active at all times, it is
recommended that the Switch be connected to a UPS (Uninterruptable Power
Supply) to prevent data loss or downtime.

2. In some areas, installing a surge suppression device may also help protect

your Managed Switch from being damaged by unregulated power surges or
current to either the Switch or the power adapter.

Switch Installation

This text describes how to install the Managed Switch and connect it as
necessary. Please read the following instructions, and perform the procedures in
the listed order.

Desktop/Shelf Installation

NOTE:

Refer to the environmental restrictions listed in the Product Specifications

when selecting a location for the Managed Switch.

Step 1:

Attach the rubber feet to the recessed areas on the bottom of the

Managed Switch.

Step 2:

Place the Managed Switch on a desktop or shelf near an AC power

source, as shown in Figure 2-4.

Advertising