Hv-t6 table box installation, 7huddle-vu, Hv-t6 installation instructions – FSR HuddleVU User Manual

Page 7

Advertising
background image

7

Huddle-VU

ASSEMBLED VIEW

UNDERSIDE VIEW OF SHROUD

HV-T6 SUB-ASS'Y

INSTALL DESIRED BRACKETS INTO THE
'HV-T6' SUB-ASS'Y. DROP THE SUB-ASS'Y
INTO THE HOLE IN THE TABLE
(COVER ORIENTATION IS PRE-SET
BY THE SHROUD INSTALLATION).

INSTALL CLAMP SHROUD TO UNDERSIDE
OF TABLE HOLE WITH (5) WOOD SCREWS

AS SHOWN. ORIENT PER DESIRED

COVER SWING DIRECTION.

PASS THE DESIRED-LENGTH (2) LONG
SCREWS THRU THE SH ROUD AND THREAD
INTO THE SUB-ASS'Y. TURN THE 3/8"-LONG
CLAMP NUTS UP SNUG AGAINST THE
SHROUD BASEPLATE TO PULL THE
SUB-ASS'Y DOWN COMPLETELY INTO
PLACE IN THE PRE-CUT 6.00" DIA. HOLE.

MAKE ELECTRICAL CONNECTIONS AS
REQUIRED AND TIE-WRAP CABLES TO
TIE-TABS. ENSURE HDMI CONNECTORS IN
THE SUB-ASS'Y CAN BE PULLED OUT 3'-0"
PRIOR TO SECURING CABLES TO TIE TABS.

HV-T6 INSTALLATION

INSTRUCTIONS

(5) #6 / #8
MOUNTING
SCREW
HOLES

6.00" DIA. THRU
HOLE IN TABLE

2

1

3

4

PRE-CUT 6.00" DIA.

HOLE IN TABLE

3/4" MIN. - 2-1/4" MAX.

TABLE THICKNESS

(7) CABLE

TIE TAB

(5) #6 / #8 x 1/2"

WOOD SCREW

(2) #6-32 x 2.00" or 2-1/2" or 3" LONG

PAN HEAD SCREW

(2) 3/8"-LONG

CLAMP NUTS

3.50

7.00

3.38

9.00

2.75

5.50

2.75

5.50

7.00

HV-T6 TABLE BOX INSTALLATION

NOTE: TABLE BOXES ARE AUTOMATICALLY
GROUNDED WHEN THAY ARE PLUGGED INTO AN
AC OUTLET. IF THE UNITS ARE NOT PLUGGED
INTO AN AC OUTLET THEY MUST BE MANUALLY
GROUNDED.

Advertising
This manual is related to the following products: