Before You Begin

3 – Installation Procedure

Before You Begin

Use the following checklist to verify you have all the required equipment to complete the
installation.

Pre-installation Power Inspection

Installation and reliability issues during the initial roll out of the FedEx project have revealed a
high number of sites with electrical issues, excessive noise, due to improper system and panel
grounding, and other issues. These issues have made it necessary to verify the quality of the
AC power at the island before removing the existing equipment and checking again post
installation to verify no issues have been introduced during the installation process.

These checks/tests are simple to complete and must not add more than 10-15 minutes to the
entire installation.

Following checks/tests pre-install are designed to identify additional work required, not
currently part of the installation scope.

1

Verify that the AC Power for the Islander PLUS System comes from a separate, dedicated
circuit breaker. No other equipment must be powered from this breaker. The system’s pumps
or dispensers must not be on this breaker. Power for the system must be 115 VAC + 10%,

47-63 HZ. The system draws 135 watts maximum.

2

Hot to Neutral

measured at: ____________ (fill in value) measured by: ____________ (print name)

This voltage must be 115 VAC + 10% (104 VAC to 126 VAC).

Hot to Ground

measured at: ____________ (fill in value) measured by: ____________ (print name)

This voltage must be 115 VAC + 10% (104 VAC to 126 VAC).

Neutral to Ground measured at: ____________ (fill in value) measured by: ____________ (print name)

This voltage must be 0 VAC + 500 millivolts (-500 mV to 500 mV).

Locate the SYSTEM POWER Terminal Block in the pedestal on the existing system. Use a
digital AC voltmeter to measure the following voltages.

Note: If power is not within these specifications, correct it before continuing.

3

Hot to Neutral

measured at: ____________ (fill in value) measured by: ____________ (print name)

This voltage must be 115 VAC + 10% (104 VAC to 126 VAC).

Hot to Ground

measured at: ____________ (fill in value) measured by: ____________ (print name)

This voltage must be 115 VAC + 10% (104 VAC to 126 VAC).

Neutral to Ground measured at: ____________ (fill in value) measured by: ____________ (print name)

This voltage must be 0 VAC + 500 millivolts (-500 mV to 500 mV).

Put ALL PUMPS into manual override and activate the pumps [ensure Submersible Turbine
Pumps (STPs)/pumping units are ON]. Use a digital AC voltmeter to measure the following
voltages

.

Note: If power is not within these specifications, correct it before continuing.

AC power is present on the Terminal Blocks in the pedestal. Electrical shock may occur if
the operator comes in contact with these connections.

WARNING

If any readings are NOT within the acceptable ranges, then STOP. For further instructions,
call Gasboy TAC at 1-800-444-5529.

IMPORTANT INFORMATION