MDE-5067 FedEx Islander PLUS FMS Installation Manual · March 2013

Page 4-33

Test Sequences

SiteOmat Software Set Up

Test Sequences

After completing hardware installation and software configuration, test each pump and verify
transaction details.

Testing Procedure for Pumps

To test the pumps, proceed as follows:

1

Verify the fuel price has been downloaded to the SiteOmat from the FHO and is set to $1.000.

2

Ensure pumps are no longer in bypass mode.

3

Run a transaction using a T-Check Card. Record the transaction information and verify the
following:

• Transaction information is captured correctly in the SiteOmat Status screen.
• Quantity is recorded correctly and matches the pump.
• Correct pump numbers and nozzle numbers are displayed in the SiteOmat Status screen.

Finalizing Installation

To ensure that the installation is complete, the Gasboy Fleet PLUS system must be online and
communicating with the FHO, and all the dispensers and satellites must be online and
operational.

Commission all serialized equipment (Islander PLUS and FiPay Server) to close the
Installation Service Request with Gilbarco Claims. Have this information available before
communicating. You are also expected to commission and close the installation with Gilbarco
Claims before leaving the facility.