Power distribution pcb1 - status indicators -17, Power distribution pcb1 - status indicators – Hypertherm HT4400 HySpeed Plasma Arc Cutting System User Manual

Page 108

Advertising
background image

MAINTENANCE

HT4400

Instruction Manual

5-17

3

Power Distribution PCB1 - Status Indicators

See page 6-5 for location of Power Distribution Board.

Notes:

When circuit breaker CB1 is switched ON, LEDs D3-D5 will illuminate and stay illuminated.

To measure voltages at the power distribution board, find fuses F1, F2 and F3. When the power supply is
energized, take measurements from the top of each fuse to chassis ground, and then from the bottom of
each fuse to chassis ground. Measurements should be as follows:

F1:

240 VAC

F2:

120 VAC

F3:

24 VAC

If voltages are not present, or incorrect at one or more of these points, disconnect power and
troubleshoot fuses and associated pins, connectors and wiring between power distribution board
connector J10 and control transformer secondary T1.

Also, check wiring and connections between T1, CB1, and CON1.

D3
240 VAC

D4
120 VAC

D5
24 VAC

F1

F2

F3

Advertising