Nstallation – Verilink 2000 (34-00182) Product Manual User Manual

Page 13

Advertising
background image

2

I

NSTALLATION

Introduction

This chapter contains information and instructions required to prepare the TxPORT
2000 CSU for use. Included are initial inspection procedures, mounting
instructions, configuration guidelines, connection instructions, and powering
information.

Throughout this manual, all factory default settings are underlined.

Safety
Summary

This manual contains information and warnings which must be followed by the
user to ensure safe operation and to retain the equipment in a safe condition.

The WARNING sign denotes a hazard to the operator. It calls attention to a procedure
or practice which, if not correctly performed or adhered to, could result in injury or loss

of life. Do not proceed beyond a WARNING sign until the indicated conditions are fully
understood and met.

Follow the proper ESD (electrostatic discharge) procedures while handling the circuit
boards.

Unpacking
and
Inspection

This unit is carefully packaged to prevent damage in shipment. Upon receipt,
inspect the shipping container for damage. If the shipping container or cushioning
material is damaged, notify the carrier immediately and make a notation on the
delivery receipt that the container was damaged (if possible, obtain the signature
and name of the person making delivery). Retain the packaging material until the
contents of the shipment have been checked for completeness and the instrument
has been checked both mechanically and electrically.

If the contents of the shipment are incomplete or, if there is mechanical damage or
defect, notify TxPORT. If the shipping container is also damaged, or the
cushioning material shows signs of stress, notify the carrier of the damage as well
as TxPORT. Keep the shipping materials for carrier’s inspection. TxPORT will
arrange for repair or replacement without waiting for claim settlement.

Supplied
Materials

The 2000 CSU is shipped from the factory with the following equipment:

2000 CSU Reference Manual

6-pin modular cable from NMS IN to NMS OUT

The following additional materials may be required for the installation and
operation of the 2000 CSU.

-48 VDC power source

!

Advertising