Dte line framing -8 – Verilink 2000 (34-00182) Product Manual User Manual

Page 20

Advertising
background image

2-8

I

NSTALLATION

DTE Line Framing

Position S5 -2 is used to match the CSU to the framing of the DTE line. The DTE
and network line framing do not have to be the same.

Down: ESF Up: D4

Network Line Code

Position S5-3 is used to set the network line coding.

Down: AMI

Up: B8ZS

DTE Line Code

Position S5-4 sets the DTE line coding. The DTE and the network line code
setting do not have to be the same.

Down: AMI Up: B8ZS

Network AIS

Position S5-5 is used to set the all ones signal sent out to the network in a Keep
Alive condition to either framed or unframed. The framed position adds framing
information to the Keep Alive signal.

Down: Unframed all ones

Up: Framed all ones

Network Keep Alive Mode

Position S5-6 is used to select the action which occurs upon a DTE loss of signal.

Down: Send AIS

Up: Loop network (RXD to network TXD)

ESF CRC6 Mode

Position S5-7 determines whether the cyclic redundancy check (CRC) code is
regenerated as data passes through the CSU or whether the CRC is passed through
unchanged.

Down: Regenerate Up: Pass

ESF Data Link Mode

Position S5-8 determines if the received facility data link (FDL) is terminated in
the CSU or is passed through unchanged.

Down: Terminate Up: Pass

Advertising