Powering up rems, Configuring and starting rems, Powering up rems -6 – Verilink Red Zone Encryption (REMS) (880-502423-001) Product Manual User Manual

Page 56: Configuring and starting rems -6

Advertising
background image

Connecting REMS components

5-6

Red Zone Encryption Management System (REMS) User Manual

Powering up REMS

1.

Be sure you have connected the system components at both ends of
the circuit.

2.

Power up the shelves housing the modules in the circuit. (If
necessary, see the appropriate AS2000 manuals referred to in the
preface of this book.)

Configuring and
starting REMS

When you have connected the components on both sides of the circuit,
configure and start REMS as described in the next chapter.

Advertising