Using heat baffles – Verilink Red Zone Encryption (REMS) (880-502423-001) Product Manual User Manual

Page 85

Advertising
background image

Multiple shelf rack-mount systems

Red Zone Encryption Management System (REMS) User Manual

9-3

Figure 9-2

System Mounting Dimensions

Each dual-line shelf and heat baffle also occupies one vertical mounting
space.

Using heat baffles

Heat baffles are mounted the same as dual-line shelves as shown in
Figur e9-2, System Mounting Dimensions. Use the same mounting
instructions described for the dual-line shelf, above.

For a rack consisting entirely of dual-line shelves, one heat baffle must be
placed between every two shelves, as shown in Figur e9-2, System
Mounting Dimensions.

If any equipment is to be mounted above two consecutively mounted
dual-line shelves, place a heat baffle between the equipment and the dual-
line shelf.

Instructions for
mounting a dual-
line shelf or heat
baffle

The dual-line has mounting ears attached to the middle of the shelf for
mid-mounting in a 19-inch (482.6 mm) rack. (See Figur e2-3, Example
Dual-line Shelf System
.) The ears are detachable for front-mounting the
module.

To mount the dual-line shelf to the equipment rack:

1.

Place the dual-line shelf in an upright horizontal position.

2.

Hold the shelf from underneath and align the mounting screw holes
on the 19-inch (482.6 mm) mounting brackets.

1.75"

1.75"

1.75"

HEAT BAFFLE

DUAL-LINE SHELF

DUAL-LINE SHELF

1 Mounting

Space

HEAT BAFFLE

1.75"

Access System 2000

Access System 2000

DLS 2100

DLS 2100

(if required)

Slot 1

Slot 1

Advertising