5 installing the ac connection, Installing the ac connection – SMA SC 500CP XT Installation User Manual

Page 28

Advertising
background image

Torques of the power connections:

Type of terminal lug

Torque

Tin-plated aluminum terminal lug on copper bar

37 Nm

Tin-plated copper terminal lug on copper bar

60 Nm

Tin-plated aluminum or copper terminal lug on aluminum bar

37 Nm

Additionally required mounting material (not included in the scope of delivery):

☐ Clean cloth

☐ Ethanol cleaning agent

Requirement:

The reduction of DC input currents must be complied with (see Section 9.3.2, page 77).

Procedure:

1. Disassemble the panels (see Section 7.2.1, page 40).

2. Disassemble the protective covers (see Section 7.2.2, page 41).

3. Prepare the cables for connection (see Section 7.3, page 44).

4. Clean the tin-plated contact surfaces in the connection area with the non-woven abrasive until they have a light

metallic sheen.

5. Clean all contact surfaces in the connection area using a clean cloth and ethanol cleaning agent and do not

touch the contact surfaces after cleaning.

6. Connect the cables in accordance with the circuit diagram. Only use the screws, nuts and washers included in the

scope of delivery and make sure that the screw heads always point forwards.

7. Secure the cables on the cable support rail. This will prevent the cable from being pulled out inadvertently.

8. Mount the protective covers (see Section 7.2.2, page 41).

9. Mount the panels (see Section 7.2.1, page 40).

5.5

Installing the AC Connection

Figure 8: Dimensions of the AC connection

5 Installation

SMA Solar Technology AG

Operating Manual

SCCPXT-IA-E4-en-44

28

Advertising