SMA SC 500CP XT Installation User Manual

Page 50

Advertising
background image

2. Strip the insulation of the insulated conductors.

3. Connect the cable in accordance with the circuit diagram.

• Remove the connection plug from the base terminal.

• Insert the screwdriver in the square opening of the

connection plug. This will release the opening of the
connection plug for the insulated conductors.

• Insert the insulated conductors of the cable into the connection plug in accordance with the circuit diagram.

• Remove the screwdriver from the connection plug.

• Plug the connection plug into the base terminal.

7 Periodic Actions

SMA Solar Technology AG

Operating Manual

SCCPXT-IA-E4-en-44

50

Advertising