11 revision history – SMA SC 500CP XT Installation User Manual
Page 81
![background image](/files/818313/content/doc081.png)
11 Revision History
In this section, you will find an overview of the content changes in the new version of this document.
Deleted content
• Removing the transport lock from the inverter bridge
Adjusted safety information
• Installation in closed electrical operating area ▸ 71
Revised installation content
• Polarity in the DC connection area added ▸ 24, 27
• Dimensions of the AC connecting plate ▸ 28
Modified operating content
• Disconnecting the DC side ▸ 36
• Reconnecting the DC side ▸ 39
Modified technical data
• Maximum AC current for Sunny Central 500CP XT ▸ 52
• Maximum AC current for Sunny Central 630CP XT ▸ 54
• Self-consumption in operation ▸ 56, 58, 60, 62, 64
• Maximum short-circuit current ▸ 52
• Reduction of DC input currents for DC fuses ▸ 77
11 Revision History
SMA Solar Technology AG
Operating Manual
81
SCCPXT-IA-E4-en-44