SMA SC 500CP-US User Manual
Page 74
                                    Advertising
                                    
                                        
                                    
                                
                                 
11 AC Connection
SMA America, LLC
74
SCCP-US-IA-US_en-41
Installation Manual
Figure 43: Assembly of the connection with two-hole terminal lugs
Requirement:
☐ The cable requirements must be complied with (see Section 11.2 "Requirements for the Cables and Cable
Additionally required mounting material (not included in the scope of delivery):
☐ Clean cloth
☐ Ethanol cleaning agent
Position
Description
A
Nut M12
B
Spring washer
C
Fender washer
D
Two-hole terminal lug
E
Copper bus bar
F
Screw M12
                                    Advertising
                    
                        
                    
                            
                            
                    This manual is related to the following products: