PLANET IGS-10020HPT User Manual

Page 150

Advertising
background image

User’s Manual

1.

While [PC-1] transmit an untagged packet enters Port-1, the Industrial Managed Switch will tag it with a VLAN

Tag=2

. [PC-2] and [PC-3] will received the packet through Port-2 and Port-3.

2.

[PC-4],[PC-5] and [PC-6] received no packet.

3.

While the packet leaves Port-2, it will be stripped away it tag becoming an untagged packet.

4.

While the packet leaves Port-3, it will keep as a tagged packet with VLAN Tag=2.

Tagged packet entering VLAN 2

5.

While [PC-3] transmit a tagged packet with VLAN Tag=2 enters Port-3, [PC-1] and [PC-2] will received the packet

through Port-1 and Port-2.

6.

While the packet leaves Port-1 and Port-2, it will be stripped away it tag becoming an untagged packet.

Untagged packet entering VLAN 3

1. While

[PC-4]

transmit an untagged packet enters Port-4, the switch will tag it with a VLAN Tag=3. [PC-5] and

[PC-6]

will received the packet through Port-5 and Port-6.

2.

While the packet leaves Port-5, it will be stripped away it tag becoming an untagged packet.

3.

While the packet leaves Port-6, it will keep as a tagged packet with VLAN Tag=3.

For this example, just set VLAN Group 1 as default VLAN, but only focus on VLAN 2 and VLAN 3

traffic flows

Setup steps

1. Add VLAN Group

Add two VLANs – VLAN 2 and VLAN 3

For Type 1-3 in Allowed Access VLANs column, the 1-3 includes VLAN1 and 2 and 3.

Figure 4-6-9:

Add VLAN 2 and VLAN 3

2. Assign VLAN Member and PVID to each port:

VLAN 2 : Port-1,Port-2 and Port-3

VLAN 3 : Port-4, Port-5 and Port-6

VLAN 1 : All other ports – Port-7~Port-28


150

Advertising
This manual is related to the following products: