2 installing the industrial managed switch, 1 installation steps – PLANET IGS-10020HPT User Manual

Page 47

Advertising
background image

User’s Manual


47

2.2 Installing the Industrial Managed Switch

This section describes how to install your Industrial Managed Switch and make connections to the Industrial Managed

Switch

. Please read the following topics and perform the procedures in the order being presented. To install your Industrial

Managed Switch

on a desktop or shelf, simply complete the following steps.

In this paragraph, we will describe how to install the Industrial Managed Switch and the installation points attended to it.

2.2.1 Installation Steps

1.

Unpack the Industrial Managed Switch

2.

Check if the DIN-Rail is screwed on the Industrial Managed Switch or not

. If the DIN-Rail is not screwed on the

Industrial Managed Switch

, please refer to DIN-rail Mounting section for DIN-rail installation. If users want to

wall-mount the Industrial Managed Switch, please refer to the Wall Mount Plate Mounting section for wall-mount plate

installation.

3.

To hang the Industrial Managed Switch on the DIN-rail track or wall.

4.

Power on the Industrial Managed Switch

. Please refer to the Wiring the Power Inputs section for knowing the

information about how to wire the power. The power LED on the Industrial Managed Switch will light up. Please refer to

the LED Indicators section for indication of LED lights.

5.

Prepare the twisted-pair, straight-through Category 5 cable for Ethernet connection

.

6.

Insert one side of RJ45 cable (category 5) into the Industrial Managed Switch Ethernet port

(RJ45 port) while the

other side to the network device’s Ethernet port (RJ45 port), e.g., Switch PC or Server. The UTP port (RJ45) LED on the

Industrial Managed Switch

will light up when the cable is connected with the network device. Please refer to the LED

Indicators

section for LED light indication.

Make sure that the connected network devices support MDI/MDI-X. If it does not support,

use the crossover Category 5 cable.

7.

When all connections are set and all LED lights show normal, the installation is completed.

Advertising
This manual is related to the following products: