Volt system operation – SmartSystem Matrix Sled Chimera (Gold Mount) User Manual

Page 12

Advertising
background image

12

T

he optional, integrated M-2 Volt

takes the groundbreaking electronic assistance to the next phase of

integration with professional mechanical stabilizers. If you’re already familiar with the Volt, the same parts

are there. The same adjustments are there. The same transparent assistance is there. Included below are

some basics, but read the Volt manual to get the full picture: Tiffen.com/pages/volt-system.

IMPORTANT:

For optimal performance, balance your sled neutral (no drop time at all) when flying Volt.

Plug the gimbal cable into the

port at the top stage, and wrap a

couple loops around the post on

its way down to the gimbal.

Plug in the cable at the gimbal.

Make sure the pan encoder cable

is also plugged in next to it.

Confirm that the Volt is switched

OFF, and in PAUSE mode, before

powering up your sled.

Align the gimbal handle along the REAR of the post,

and simultaneously power on the Volt.

When the rig is up, and you’re

ready to go, run the Volt by

switching the pause switch to ON.

NOTE:

Unlike with the external Volt box, goofy and regular operators

BOTH

align the gimbal handle to the rear

of the post, regardless of which side the Volt control boxes are placed on the M-2.

Volt system operation

Advertising