Installing volt electronics – SmartSystem Matrix Sled Chimera (Gold Mount) User Manual

Page 18

Advertising
background image

18

T

he Volt electronics

are hidden inside the top stage, just beneath the dovetail clamp. All M-2 sleds are

pre-wired to easily upgrade to Volt. Factory installation is recommended, but it’s not too difficult.

CAUTION:

Take proper ESD protection when installing the Volt control board into the stage, and confirm

that no batteries are installed on the sled at time of installation.

Remove the eight hex screws

securing the dovetail clamp to the

top stage chassis. Carefully lift the

stage top STRAIGHT off.

Fasten the Volt brain to the stage

chassis with the four included

screws, one in each corner.

Replace the stage top STRAIGHT down onto the stage. DO NOT slide

the top into place, which may damage the VOLT electronics. DO NOT

pinch any cables, and ensure internal power cables can slide freely.

Finish by fastening the stage top with the eight hex screws.

Inside, you’ll find three cable sets with connectors that attach to the

Volt circuit board, the largest is at the front of the stage. Align the

circuit board as shown, and plug them in. Make sure each connector is

orientated properly, and be gentle!

NOTE:

There are buttons and jumpers on the Volt electronics for programming the board. DO NOT touch unless instructed to do so!

Installing Volt electronics

Advertising