M-2 volt compared to m-1 volt – SmartSystem Matrix Sled Chimera (Gold Mount) User Manual

Page 30

Advertising
background image

30

V

olt integration

into the new M-2 gimbal differs from an installation on an M-1 gimbal in two practical

ways: the pan encoder is now internal, and the trunnion pulley has a different mechanism (similar to

previous “upgrade kits” for U2/Archer/PRO gimbals.) Let’s take a look at how installing the Volt onto an M-2

would be different, with all the other install steps in the Volt manual remaining the same.

NOTE:

For more information on the Volt system use and installation, refer to the Volt manual, LIT-817001.

The gimbal remains on the post,

and the trunnion screws remain in

place. Use the Blue Whale tool to

remove both side covers.

Replace the cover with a thread

adapter over the trunnion screw,

on the side of the gimbal where

you’ll mount the motor assembly.

The trunnion pulley threads

onto the opposite side, no

thread adapter necessary. Use

the supplied Blue Whale tool to

tighten the pulley in place.

Remove the tiny hex screws from the cover in the

gimbal housing, and install the pan encoder in its

place with the cable side up. Reuse the same two

screws to fasten it.

Route the encoder cable over the Volt body, to the

side of the gimbal, and connect at the Encoder port.

M-2 Volt compared to M-1 Volt

Advertising