Installing or moving volt control boxes – SmartSystem Matrix Sled Chimera (Gold Mount) User Manual
Page 19

Remove the four screws, and
remove this cover under the stage
nose. You may have to adjust
the stage side-to-side to access
screws and slide out the cover.
Unscrew the two hex screws in
each cover or control box, and set
aside the covers if you’re installing.
We’ll reuse the hex screws.
Choose which side for each
control box; typically the dials face
the operator for quick adjustments
while shooting. Carefully route the
cables out the respective sides of
the stage:
• The switch box connector has
8 pins, the dial box has 6 pins.
• Plug in each box.
Fasten the boxes to the stage
chassis with the hex screws, taking
care that they’re right-side-up.
Replace the underside cover,
being careful not to pinch any
wires, and fasten with the screws.
NOTE:
If you already own a Volt system, you can use it with the mustache box attached to the rods, same as on an M-1. We won’t
judge. But you can’t remove the circuit board from the Volt box, and put it inside the M-2, because it doesn’t fit.
I
nside the stage nose
are connectors for the Volt control boxes. Installation is straight forward, as shown.
Or, you may wish to swap sides of the boxes, so the dials face an operator with regular or goofy stance.
Installing or moving Volt control boxes