Heatilator • Constitution EPA Fireplace • 480-1091C

November 11, 2008

Figure 26.1 Ceiling/Attic Construction

Fire Risk

• Must maintain 2 in. (51 mm) air clearance

to insulation and other combustible

materials.

WARNING

•

Mark the Exit Point of the Roof

Locate the point where the chimney will exit the roof by

plumbing down to the center of the chimney. Drive a nail

up through the roof to mark the center. See Figure 26.1.

• Cut Out the Hole in the Roof

Measure to either side of the nail and mark the 14-1/2 in.

x 14-1/2 in. (368 mm x 368 mm) opening required. This

is measured on the horizontal; actual length may be larg-

er depending on the pitch of the roof. Cut out and frame

the opening. See

Chapter 25 of the Uniform Building

Code for roof framing details.

• Assemble the Chimney Sections Through the

Roof

Continue to add chimney sections through the roof open-

ing, maintaining at least a 2 in. (51 mm) air space to com-

bustible materials.

• Install the Roof Flashing

If a roof flashing is to be used, install the roof flashing

appropriate to the roof pitch and install a termination cap

and storm collar following the instructions shipped with

the cap.

For chase installations you can use a round termination

cap, a round telescoping termination cap or a square

termination cap (See pages 62-63). A chase installation

must use a chase top. Chase tops are available from your

dealer. See page 14 for building a chase.

• Install the Chimney Air Kit (required in Canada):

When installing the chimney air kit, follow the instructions

provided with this accessory. See page 22.

• Completion of the Enclosure

Complete the fireplace enclosure, allowing space for

outside air ducts. Electrical wiring should not come in

contact with the fireplace.

A minimum clearance of 1/2 in.

(13 mm) must be maintained between the fireplace

back and 1 in. (25 mm) minimum clearances to sides

and the enclosure.

NOTE: Wiring for fans must be done before framed

enclosure is completed. If using a Heat Zone kit, it also

must be installed before enclosure is complete.