2.3 Commissioning

Connect the solar inverter internally via

the ground cable (yellow-green) to the

cabinet cover. (See also Setup, step 7)

Put the cabinet cover on.

Screw it down tightly with the four

screws on the front.

Do not place any objects (e.g. this manu-

al) on the cabinet of the solarinverter.

Free ventilation behind the solar inverter

must be able to take place unimpeded.

If the unit is installed in the open air,

please take special care to ensure that the

screwed cable glands are properly sealed

and that the cabinet cover is precisely

located.

Switching the solar inverter on and off

· Switching on

When the solar inverter is mechanically

installed and connected to the electrical

cables, the unit can be commissioned as

follows:

Switch the grid connection on through

the external safety cutouts.

Switch the PV generator voltage on by

closing the PV generator switch. The solar

inverter will start up with adequate

PV power. If the PV input voltage is high

enough, the solar inverter will begin ope-

ration and feed the solar energy into the

electrical grid. You can see the operation

on the display. The current feed-in power

is shown here.

The solar inverter is supplied by the PV

generator. The solar inverter switches on

in the morning and off again in the eve-

ning. The relevant switching on and swit-

ching off thresholds are defined for the

PV generator. If the solar energy is not

sufficient to supply the electronics, several

switch-on attempts may have to be made