Installing the vent panel, To install the vent panel on two 8-port switches – Sun Microsystems FC Switch-8 and Switch-16 816-0830-12 User Manual

Page 77

Advertising
background image

Chapter 4

Hardware Installation

47

FIGURE 4-4

Installing Four 8-Port Switches Into the Mounting Rails

Installing the Vent Panel

This section describes how to install the vent panel on the switches in your
configuration.

“To Install the Vent Panel on Two 8-Port Switches” on page 47

“To Install the Vent Panels on Four 8-Port Switches” on page 48

“To Install the Vent Panel on a 16-Port Switch” on page 49

To Install the Vent Panel on Two 8-Port Switches

1. Mount the 1-U filler panel at the very top. Tighten the captive screws.

Advertising