To install the vent panels on four 8-port switches – Sun Microsystems FC Switch-8 and Switch-16 816-0830-12 User Manual

Page 78

Advertising
background image

48

Sun StorEdge Network FC Switch-8 and Switch-16 Installation and Configuration Guide • October 2001

2. Mount the 1-U filler panel above the vent panel and below the existing 2-U filler

panel.

3. Tighten the captive screws.

FIGURE 4-5

Installing the Vent Panel— Two 8-Port Switch Configuration

To Install the Vent Panels on Four 8-Port
Switches

1. Mount each of the two vent panels over the front of a set of two switches.

No filler panel is necessary.

2. Tighten the captive screws.

1-U filler panel

3- U Vent panel

Advertising