3.4.3 Load Transfer Procedures

Use the Monitor/Mimic Display at the SCC to determine the operating condition of the UPS system.

Press the Alarm Reset pad to clear the Alarm Messages. If all UPS modules are on-line, the only

message remaining should be Load On Bypass. Refer to Table 9 for an explanation of any other

remaining alarm messages. Call Liebert Global Services if you cannot clear any remaining alarm

messages.
If the only alarm message displayed is Load On Bypass (or no alarms), you can perform a manual

transfer of the load between the UPS system and the UPS bypass line. Changing the load from the

UPS system to the UPS bypass is called a transfer. Changing the load from UPS bypass to the UPS

system is called a retransfer. Note that the UPS system control logic can initiate automatic load

transfers and retransfers. Refer to 3.5 - Automatic Operations.
Press the Select pad to display the Master Menu on the LCD of the SCC. Move the highlighted cursor

to Load Transfer Procedures (using the Up and Down pads). Press the Select pad to display the

Load Transfer Procedures screen.
Step 1. Verify that the OK TO TRANSFER message is highlighted. If not (if the TRANSFER PRO-

HIBIT message is highlighted instead), slowly rotate the Voltage Adjust knob (Figure 10, item 6)

to match the UPS system voltage to the bypass voltage.

Figure 66 Load transfer procedures screen

Step 2. Perform Step 2 on the Load Transfer Procedures Screen.

a. If the load is on internal bypass, simultaneously press the UPS and Control Enable

pads (Figure 10). This will close the motorized UPS Output circuit breaker and open the

motorized System Bypass circuit breaker (SBB) in a make-before-break sequence.

b. If the load is on the UPS system, simultaneously press the Bypass and Control Enable

pads (Figure 10). This will close the motorized System Bypass circuit breaker (SBB) and

open the motorized UPS Output circuit breaker in a make-before-break sequence.

Return to the Monitor/Mimic Display screen to monitor the operation of the UPS system. Press the

Alarm Reset pad to clear any latched alarm messages removed by the new load status. Refer to

Table 9 if an alarm message other than Load On Bypass is still displayed. Contact Liebert Global

Services if you require assistance.

NOTE
1. UPS output voltage changes VERY slowly in response to movements of the Voltage Adjust

knob. To avoid overshooting, allow at least a minute for UPS output voltage to stabilize

before proceeding to the next step.

2. If the TRANSFER PROHIBIT message remains, refer to Table 9 for corrective action for

any alarm messages. Call Liebert Global Services if you cannot solve the problem.

TRANSFER PROHIBIT

UPS LEAD

=

2 Deg

UPS

-

BYPASS

-

380

380

380

381

B-C

A-B

VOLTAGE COMPARISON

SELECT : MASTER MENU

OK TO TRANSFER

+30

ON UPS

50.0 Hz

379

C-A

FREQUENCY

MANUAL

TRANSFER INSTRUCTIONS

1.

Adjust the UPS voltage until it equals the
bypass voltage with the VOLTAGE ADJUST pot.

2.

If the OK TO TRANSFER message is highlighted,
simultaneously press the BYPASS and CONTROL ENABLE
buttons.

3.

Verify that the transfer was successful by checking the

breaker status on the "MONITOR/MIMIC" screen.

4.

Press the ALARM RESET button to clear alarms which
are no longer active

SYNCHRONIZATION

50.0 Hz

0

-30

380

ON BYPASS

Adjust the UPS voltage until it equals the

bypass voltage with the VOLTAGE ADJUST pot.
If the OK TO TRANSFER message is highlighted,

simultaneously press the UPS and CONTROL ENABLE

buttons.
Verify that the transfer was successful by checking the

breaker status on the "MONITOR/MIMIC" screen.
Press the ALARM RESET button to clear alarms which

are no longer active.