7 before operating – Omron NT-series Programmable Terminal V022-E3-1 User Manual

Page 34

Advertising
background image

Note

Reference



      

Section 1-7

2-7

Before Operating

Follow the procedure given below to start the system of the NT600S.

When using Host Link/NT Link/RS-232C

PC

NT600S

Support tool

Check and change
the PC settings.



For the host link, refer
to page 31 and the
manuals for the host
link unit and peripheral
tools.



For the NT link (1:1),
refer to page 43.



For the NT link (1:N),
refer to page 47.



No special setting re-
quired for C200H di-
rect communication



For RS-232C:
Refer to page 63
Refer to the manuals
supplied with the Host.

Connect to the
NT600S.

Create the PC
program.

Set the DIP switches.

(page 26)

Install to the
operation panel.

(page 27)

Connect the power
supply.

(page 28)

Connect to the PC.



(Host link: page 31)



(NT link (1:1): page 43)



(NT link (1:N): page 47)



(C200H direct commu-
nication: page 56)



(RS-232C: page 63)

Check the settings
and communications.

Transfer the
screen data.

(page 79)

Install support tools to
the computer.

(refer to Section 4 and the
manuals for the support
tools)

Create the screens.

Start operation.

Host

Check and change the
connection at the Host.

Create the Host
program.

(page 31)

Refer to the manuals
supplied with the Host.

Refer to Section 6.
Refer to the manuals
supplied with the Host.

Before starting actual operation, check the screen data and the program to be run
at the Host completely for its operation.

For usable support tools, refer to Appendix H Making the Cable for Connection to
the Support Tool (page 278)

Advertising