Quantum Data 881 User Manual

Page 243

Advertising
background image

881/882 Video Test Generator User Guide

(Rev A.22)

225

the generator

” on page 31 or

Establishing a Telnet session with the generator

” on page

34.

2. Enter the following commands:

SEQL

seqname

// loads the sequence into sequence edit buffer

SMOD

1

// where 1=step&stop; 2=step&wrap; 3=auto

SEQU

// starts running the sequence

The generator’s display shows the format and image name for each step, the mode,
and the current step number. Additionally, the sync gate status and output status
appear on the right, and the color gate status appears on the left, as shown below:

If the sequence is set to auto, it begins running. Otherwise, press the + and - keys to
move through the sequence steps.

To stop a sequence:

Enter the following command:

SMOD

0

SEQU

To run a sequence at power up:

1. Run the sequence in the desired mode.

2. Cycle the power to the generator. Depending on the selected mode, the sequence will

start automatically, or you can press the + and - keys to step through the sequence.

+Red myseq

ACS

+Grn Step:00001

DCS

+Blu DMT0660

DSS*

Inv SMPTE133

Out+

Advertising
This manual is related to the following products:

882