To run the Link Layer compliance test on DisplayPort sinks (receiver) through the
front panel:

1. Connect a cable between the DisplayPort Tx connector on the generator and the

device’s DisplayPort receiver interface with the DisplayPort function.

The following diagram depicts the test setup:

2. Setup the 882 for DisplayPort testing. Refer to

Setting up the 882 for DisplayPort

testing:

” on page 454.

3. Press the

Tools key and choose the Reports item by pressing the adjacent soft key.

The following is displayed on the generator’s LCD.

The following is displayed on the generator’s LCD.

4. Set the Link Layer test parameters.

There are some parameters that you can set to control the way the link layer tests are
run in automation mode. These parameters have to be set through the command line.
The following parameters can be set:

Delay time between tests:

DPTX:SATW 15

// sets the wait time between link layer tests

to 15 seconds.

'LVSOD\3RUW/LQN/D\HU

6RXUFH

(

6LQN 5HFHLYHU

'87

'LVSOD\3RUW7[

System

Reports

Sequence

ImgShift

Probe Analyzer
AFC

EDID

Misc

HDCP

Link Test

AFC

Advertising
This manual is related to the following products:

882