Ev charging station, User manual & installation instructions – GE Industrial Solutions NEMA EVSE CHARGING STATION User Manual
Page 15
Advertising
g
EV Charging Station
User Manual & Installation Instructions
GE EV Charging Station User Manual
15 of 86
BASE MOUNTING ASSEMBLY – DURING CONCRETE POUR. ALLOW MIN. 5” CONDUIT LENGTH
ABOVE CONCRETE FLOOR LEVEL
Adjust (4) ½-13 nuts to position height as shown in Figure 13.
Pour concrete to level shown in Figure 13. Do not cover the ½-13 nuts with concrete. Remove
mounting template from threaded rods after concrete has cured. Do not remove ½-13 nuts as they
are used for leveling the skirt.
Figure 13
5.50
Advertising