Ev charging station, User manual & installation instructions – GE Industrial Solutions NEMA EVSE CHARGING STATION User Manual

Page 15

Advertising
background image

g

EV Charging Station

User Manual & Installation Instructions

GE EV Charging Station User Manual

15 of 86


BASE MOUNTING ASSEMBLY – DURING CONCRETE POUR. ALLOW MIN. 5” CONDUIT LENGTH
ABOVE CONCRETE FLOOR LEVEL


Adjust (4) ½-13 nuts to position height as shown in Figure 13.

Pour concrete to level shown in Figure 13. Do not cover the ½-13 nuts with concrete. Remove
mounting template from threaded rods after concrete has cured. Do not remove ½-13 nuts as they
are used for leveling the skirt.



















Figure 13

5.50

Advertising