Ev charging station, User manual & installation instructions – GE Industrial Solutions NEMA EVSE CHARGING STATION User Manual

Page 7

Advertising
background image

g

EV Charging Station

User Manual & Installation Instructions

GE EV Charging Station User Manual

7 of 86




Locate area for pedestal location.






Install two conduits, one for power, and one for communication (if required). Allow approximately 5”
length for each conduit above the concrete level as shown in Figure 4. Cut as necessary to final
dimensions. Route power conduit and communication conduit through the center of the hole in the
mounting template, appropriately.

Install base mounting assembly plate securely over conduits with mounting template and four 1/2-13
nuts.

CONDUIT

MOUNTING TEMPLATE

BASE MOUNTING
ASSEMBLY

CONCRETE

Figure 2

WARNING: Make sure power to the EVSE is

disconnected before performing any task

Figure 3

Advertising