GE Industrial Solutions NEMA EVSE CHARGING STATION User Manual
Page 54
Advertising
g
EV Charging Station
User Manual & Installation Instructions
GE EV Charging Station User Manual
54 of 86
Figure 54: EVSE Controller
The configuration dip switch has positions 1 thru 8. Switches 1 to 4 are set and locked by the
manufacturer, and switch 5 is reserved for future use. Switches 6, 7 and 8 are set at installation of the
EVSE into its operational environment.
S6 -Configuration
Dip Switch
Ethernet
Connector
J1
Advertising