GE Industrial Solutions NEMA EVSE CHARGING STATION User Manual

Page 54

Advertising
background image

g

EV Charging Station

User Manual & Installation Instructions

GE EV Charging Station User Manual

54 of 86



Figure 54: EVSE Controller



The configuration dip switch has positions 1 thru 8. Switches 1 to 4 are set and locked by the
manufacturer, and switch 5 is reserved for future use. Switches 6, 7 and 8 are set at installation of the
EVSE into its operational environment.

S6 -Configuration
Dip Switch

Ethernet
Connector
J1

Advertising