Site Overview & Planning

Revision D

Installation

1-3

Using an Existing Pad

In many applications, SlideSmart may be a replacement
operator for an existing gate system.
Make sure the pad is level and inspect the pad for:

Compliance with local building codes.

Appropriate distance from the gate. See Figure 1-4.

Appropriate dimensions (See Figure 1-2) for
SlideSmart installation.

Durability.

To use an existing pad, take the following steps:

1. Remove any existing equipment from the pad.
2. Measure the pad to ensure it is sized properly for

SlideSmart.

3. Check the mounting hole locations and re-drill, if

necessary.

4. Follow the steps in

Concrete Pad Mount

.

CAUTION

Consider positioning the operator so existing conduit enters the cutout in the SlideSmart base
plate. Cutting small holes in the plastic base plate and cover for pre-existing conduit is
permissible. Two 0.875-inch (22mm) diameter holes for running conduit are also provided on
both sides of the chassis. See Figure 1-5.

Side View

7

¾"

(19.7cm)

Figure 1-4.

Concrete pad

Chain

Chain to Gate
Ideal distance =
Minimum distance = 2½" (6.4cm)

height

Grade
level

Gate

3¾" (9.5cm)

Cut out
if rear
install

Figure 1-5.

Conduit cut outs