Controlled Products Systems Group SLIDESMART DC 10F User Manual

Page 40

Advertising
background image

Installing the Earth Ground

2-2

SlideSmart DC Installation and Reference Manual

Revision D

Take the following steps to comply with NEC and NFPA
780 standards:
1. Install a grounding rod per local building codes. See

Figure 2-1.

2. Attach a large earth ground wire (6AWG) from the

grounding rod to the lug nut on the base of the chassis.

New site: Run the 6AWG wire through the concrete
base and into the cutout on the chassis base.

Existing site: Run the 6AWG wire beneath the rear
cover.

Properly grounding the gate operator is critical to gate
operator performance and the life of its electrical
components. Use sufficient wire size during installation.
Refer to

Wiring 115VAC Power

or

Wiring 208/230VAC

Power

.

Consult

local
codes for

3 ft

Figure 2-1.

proper
depth.

Lug nut

Ground wire
and lug nut

Advertising
This manual is related to the following products: