Npacking, Perator – Controlled Products Systems Group SLIDESMART DC 10F User Manual

Page 28

Advertising
background image

Unpacking the Operator

1-6

SlideSmart Installation and Reference Manual

Revision D

U

NPACKING

THE

O

PERATOR

Prepare the gate operator for installation. See Figure 1-8.

1. Open the top of the box and remove packing materials.
2. Cut open the box to access the operator.
3. Lift the cover up and off the base of the operator. DO NOT lift the cover by its lock.

Service Outle

t

115VAC, 15A

Cover

Base plate

Figure 1-8.

Lock

Advertising
This manual is related to the following products: