Installing the extended battery backup kit -12, R to, Installing the extended battery – Controlled Products Systems Group SLIDESMART DC 10F User Manual

Page 50: Backup kit, Installing the extended battery backup kit

Advertising
background image

Important Considerations for DC-powered Operators

2-12

SlideSmart DC Installation and Reference Manual

Revision D

Installing the Extended Battery Backup Kit

Figure 2-8.

HySecurity offers an extended DC power back up option with two 50Ah batteries. Contact HySecurity parts
department to order extended battery backup kit with base extension (P/N MX002141).

To install the extended battery backup kit:

1. Turn off the DC and AC power switches.
2. Place the accessory tray on the studs inside the

base riser. See Figure 2-10.

3. To access the 8Ah batteries and disconnect its

wires, cut the two black wire ties and slide the
8Ah batteries through the access window.
Another option is to remove the four screws
that hold the control box to the chassis. See
Figure 2-9.

DANGER

!

Make sure both the left and right 8Ah DC battery wires are disconnected. Never mix battery sizes,
types, or brands. HySecurity strongly recommends that only sealed AGM style batteries be used.
If you plan to remove the batteries from the operator, properly store or discard them. Refer to

Hazardous Materials and Proper Disposal

.

50Ah batteries

Accessory tray

Post-mounted
operator with
base extension

Posts not included
in kit

Figure 2-9.

8Ah battery

Control box

Wire ties

8Ah battery

Screws
(4x)

Access window

Advertising
This manual is related to the following products: