Replacing a cable management finger assembly – Brocade DCX 8510-4 Backbone Hardware Reference Manual User Manual

Page 64

Advertising
background image

FIGURE 20 Removal and replacement of the vertical cable management finger assemblies

Replacing a cable management finger assembly

Complete the following steps to replace the cable management finger assembly.

1. Position and tighten the three (3) screws to secure the vertical cable management finger assembly

to the rack upright.

2. Arrange the cables along the cable management finger assembly.
3. If necessary, repeat steps 1 and 2 for the other cable management finger assembly.
4. Replace the chassis door.

Port, application, and encryption blade removal and replacement

This document describes how to remove and replace port, application, and encryption blades. It does
not cover the core (CR) blades or the control processor (CP) blades.

CAUTION
If you do not install a module or a power supply in a slot, you must keep the slot filler panel in
place. If you run the chassis with an uncovered slot, the system will overheat.

Slots are numbered from 1 through 8, from bottom to top when facing the port side of the Brocade
DCX 8510-4. Port, application, and encryption blades can be installed in slots 1-2 and 7-8.

Replacing a cable management finger assembly

64

Brocade DCX 8510-4 Backbone Hardware Reference Manual

53-1002177-07

Advertising