Time and items required, Removing a blade, Time and items required removing a blade – Brocade DCX 8510-4 Backbone Hardware Reference Manual User Manual

Page 65

Advertising
background image

This section is applicable for all the following port, application, and encryption blades supported on the
DCX 8510 chassis:

Blade

DCX

DCX-4S

DCX 8510-4

DCX 8510-8

FC8-32E port blade

No

No

Supported

Supported

FC8-48E port blade

No

No

Supported

Supported

FC8-64 port blade

Supported

Supported

Supported

Supported

FC16-32 port blade

No

No

Supported

Supported

FC16-48 port blade

No

No

Supported

Supported

FC16-64 port blade

No

No

Supported

Supported

FCOE10-24 application
blade

Supported

Supported

No

Supported (only on
slot 1)

NOTE
Cannot be in the same chassis with FC8-48E, FC8-64, FC16-48, FC16-64, FS8-18, or
FX8-24.

FS8-18 encryption blade

Supported

Supported

Supported

Supported

FX8-24 application blade

Supported

Supported

Supported

Supported

Time and items required

The replacement procedure for each blade takes less than 10 minutes. Removing and restoring
transceivers and cables may take longer depending on how many must be changed. The following
items are required for the blade and filler panel replacement:

• Electrostatic discharge (ESD) grounding strap
• Workstation computer
• Replacement blade or filler panel
• #2 Phillips screwdriver
• Small form-factor pluggable (SFP+, mSFP, or QSFP) transceivers (as needed)
• Optical and copper cables (as needed)

NOTE
For information about the transceivers that are qualified for the Brocade chassis, refer to

Transceiver

removal and replacement

on page 87.

Removing a blade

Complete the following steps to remove a blade.

Time and items required

Brocade DCX 8510-4 Backbone Hardware Reference Manual

65

53-1002177-07