Transceiver removal and replacement – Brocade DCX 8510-4 Backbone Hardware Reference Manual User Manual

Page 87

Advertising
background image

DANGER
For safety reasons, the ESD wrist strap should contain a series 1 megaohm resistor.

1. Ensure that the chassis is still powered off. If not, power down the entire chassis.
2. Unpack the two new WWN cards and save the packaging for the faulty WWN cards.

The WWN cards and cables are labeled #1 for the left slot and #2 for the right slot.

3. Hold each card by the edges and slide the card into the chassis. Use the Phillips screwdriver and the

screws to secure the WWN card to the chassis.

4. Power on the chassis and wait for five minutes for the chassis to boot.
5. Verify that the WWN card is correctly connected by checking the LEDs on the WWN card to see if

they reflect the status of the components.

NOTE
The LEDs may take up to two minutes after WWN card installation to begin functioning.

6. Install the WWN bezel. Orient the bezel on the chassis. Insert and tighten the screws.
7. Verify the new card settings by running the following commands and comparing the output with the

original supportsave data:

1. licenseidshow
2. ipaddrshow
3. switchname
4. chassisname
5. wwncardshow ipdata
6. chassisshow (look at the WWN and Chassis information at the bottom)
7. ficonshow switchrnid

8. Run the switchcfgpersistentenable command to persistently enable each logical switch, that were

disabled before removing the WWN cards:

switch:FID128:root> switchcfgpersistentenable

Switch's persistent state set to 'enabled'

9. Pack the faulty WWN cards in the packaging provided with the new cards, and return them to

Brocade Support for failure analysis (FA).

Transceiver removal and replacement

Use this procedure to remove and replace a transceiver.

Blade

Transceiver

Auto-negotiate/Fixed

Speeds supported(xGbps)

FC8-32E and FC8-48E

SFP+

Auto negotiate

2, 4, and 8.

FC8-64

mSFP

Auto negotiate

2, 4, and 8.

FC16-32 and FC16-48

SFP+

Auto negotiate

2, 4, 8, and 16

FC16-32 and FC16-48

10-Gbps SFP+

Fixed

10

FC16-64

QSFP

Auto negotiate

4, 8, and 16

Transceiver removal and replacement

Brocade DCX 8510-4 Backbone Hardware Reference Manual

87

53-1002177-07

Advertising