Scenario one, Scenario two – Spectra Precision Survey Pro v3.80 Recon iPAQ User Manual User Manual

Page 72

Advertising
background image

User’s Manual

64

Scenario One

You know the coordinates and locations for two points on your lot and
want to occupy one and use the other as a backsight.

Solution

1.

Create a job using the coordinates for one of the known points as
the first point.

2.

Use the Edit Points routine to add a second point using the
coordinates for the remaining known point.

3.

From the Backsight Setup screen, set the

Occupy Point

field to the

point number of one known point and setup the total station over
that point.

4.

Toggle the



%6 'LUHFWLRQ



/



%6 3RLQW



button to

%6 3RLQW



and

enter the point name for the second known point in that field.

5.

Aim the total station toward the other point, zero the horizontal
angle on the instrument, and tap

6ROYH , then &ORVH . If the

Always Prompt for Backsight Check

option is checked in the

Job

|

Settings

|

General

screen, you will be prompted to check your

backsight.

You are now ready to start your survey.

Scenario Two

You have found two points on your lot and know the azimuth between
them, but you do not have coordinates for either.

Solution

1.

Create a job using the default coordinates for the first point.

2.

From the Backsight Setup screen, set the

Occupy Point

field to the

point that was just created.

3.

Setup the total station over the point where the known azimuth is
referenced.

Advertising