Set up – Spectra Precision Survey Pro v3.80 Recon iPAQ User Manual User Manual

Page 85

Advertising
background image

Fieldwork

77

Set Up

1.

Open the job that was created in the Traverse / Side Shot
Example.

a.

From the Main Menu, select

)LOH , 2SHQ  1HZ to open the

Open / New screen.

b.

Tap the file name that was created earlier
listed in the

Open Recent Job

list and then tap



2SHQ . The coordinates for that job are shown

here.

2.

Set the job settings. (Only the settings that affect
this example are covered here.)

a.

Select

-RE , 6HWWLQJV from the Main Menu.

b.

Tap the

Instrument

tab and set both the

Brand

and

Model

fields to

Manual Mode

.

c.

Tap the

Surveying

tab and confirm that all of

the checkboxes are unchecked.

d.

Tap the

Stakeout

tab and make sure the final

field (

Cut Sheet Offset Stored)

is set to

Actual

Offset

.

Note: When performing stakeout, you have the option of storing cut
sheet information. This information is stored in the raw data file,
and when using software on a PC, such as Survey Link, it can be
extracted in the form of a Cut Sheet Report.

e.

Tap OK to save the job settings.

3.

Setup your backsight. In this example, we will setup on Point 1
and backsight an object where it is assumed that the direction to
that object is known. When connected to a total station, you
would setup over your occupy point, aim toward the backsight
and zero the horizontal angle in the total station before
continuing.

a.

Access the

6XUYH\ , %DFNVLJKW 6HWXS screen.

Advertising