Danger – Allied Air Enterprises WARM AIR GAS FURNACE 92G1UH User Manual

Page 15

Advertising
background image

506724-01

Page 15 of 57

Issue 1108

Joint Cementing Procedure

All cementing of joints should be done according to the

specifications outlined in ASTM D 2855.

1. Measure and cut vent pipe to desired length.

2. Debur and chamfer end of pipe, removing any ridges or

rough edges. If end is not chamfered, edge of pipe

may remove cement from fitting socket and result in a

leaking joint.

3. Clean and dry surfaces to be joined.

4. Test fit joint and mark depth of fitting on outside of pipe.

5. Uniformly apply a liberal coat of PVC primer for PVC or

use a clean dry cloth for ABS to clean inside socket

surface of fitting and male end of pipe to depth of fitting

socket.

NOTE: Time is critical at this stage. Do not allow primer to

dry before applying cement.

DANGER OF EXPLOSION!

Fumes from PVC glue may ignite during system check.

Allow fumes to dissipate for at least 5 minutes before

placing unit into operation.

DANGER

NOTE: A sheet metal screw may be used to secure the

intake pipe to the connector, if desired. Use a drill or self

tapping screw to make a pilot hole.

TABLE 3

OUTDOOR TERMINATION KITS USAGE

A95UH
A93UH
95G1UH
92G1UH

VENT

PIPE

DIA.

(in.)

STANDARD

CONCENTRIC

Outdoor
Exhaust

Accelerator

(Dia. X

Length)

Outdoor
Exhaust

Accelerator

(Dia. X

Length)

Flush-
Mount

Kit

1−1/2"

Concentric

Kit

2"

Concentric

Kit

3"

Concentric

Kit

1−1/2" X 12"

2" X 12"

51W11**

71M80

or

44W92

69M29

or

44W92

60L46

or

045

2

YES

YES

YES

2−1/2

YES

YES

YES

3

YES

YES

YES

070

2

YES

YES

YES

2−1/2

YES

YES

YES

3

YES

YES

YES

090

2

YES

YES

YES

YES

2−1/2

YES

YES

YES

YES

3

YES

YES

YES

YES

110

2

YES

YES

YES

YES

2−1/2

YES

YES

YES

YES

3

YES

YES

YES

YES

135

3

YES

YES

YES

*Requires field−provided and installed 1−1/2" exhaust accelerator.
** Kit 51W11 is provided with a 1−1/2" accelerator which must be used for all 45,000 and 70,000 furnace installations.

†† The 44W92 Concentric kit is provided with a 1-1/2” accelerator which must be installed on the exhaust outlet when
this kit is used with the 45,000 and 70,000 furnaces.

44W93

Advertising
This manual is related to the following products: