Allied Air Enterprises WARM AIR GAS FURNACE 92G1UH User Manual

Page 52

Advertising
background image

506724-01

Page 52 of 57

Issue 1108

21. Remove two screws from the front cabinet flange at the

blower deck. Spread cabinet sides slightly to allow

clearance for removal of heat exchanger.

22. Remove screws along vestibule sides and bottom which

secure vestibule panel and heat exchanger assembly

to cabinet. Remove two screws from blower rails which

secure bottom heat exchanger flange. Remove heat

exchanger from furnace cabinet.

23. Back wash heat exchanger with soapy water solution or

steam. If steam is used it must be below 275°F (135°C).

24. Thoroughly rinse and drain the heat exchanger. Soap

solutions can be corrosive. Take care to rinse entire

assembly.

25. Reinstall heat exchanger into cabinet making sure that

the rear baffle of the heat exchanger assembly is nested

under the support located at the rear of the cabinet.

Remove the indoor blower to view this area through the

blower opening.

26. Re–secure the supporting screws along the vestibule

sides.

27. Reinstall blower assembly and reinstall two screws

through rails.

28. Reinstall cabinet screws on front flange at blower deck.

29. Reinstall screws securing top cap.

30. Reinstall the primary limit on the vestibule panel.

31. Route heating component wiring through hole in blower

deck and reinsert strain relief bushing.

32. Reinstall pressure switch and reconnect pressure switch

wiring.

33. Carefully connect combustion air pressure switch hosing

from pressure switch to proper stubs on cold end header

collector box.

34. Reinstall 1/2" NPT (if removed) in the cold end header

box. Reconnect drain tubing to collector box.

35. Reinstall condensate trap pipe. Reconnect condensate

drain line to the condensate trap.

36. Reinstall electrical junction box.

37. Reinstall the combustion air inducer and flexible no hub

connector. Reconnect the 2 pin plug to the wire harness.

38. Reconnect drain tubes between flue collar and cold end

header box.

39. Secure burner assembly to vestibule panel using four

existing screws. Burners are self aligning to center of

clam shells.

40. Reconnect gas supply line to gas valve.

41. Reconnect flame rollout switch wires.

42. Reconnect sensor wire and reconnect 2 pin plug from

ignitor.

43. Reconnect wires to gas valve.

44. Replace the blower compartment access panel.

45. Refer to instruction on verifying gas and electrical

connections when reestablishing supplies.

46. Follow lighting instructions to light and operate furnace

for 5 minutes to ensure that heat exchanger is clean

and dry and that furnace is operating properly.

47. Replace heating compartment access panel.

Cleaning the Burner Assembly

1. Turn off gas and electrical power to the furnace. Remove

heating compartment access panel.

2. Disconnect the gas supply line from the gas valve.

3. Disconnect and label wires from gas valve.

4. Disconnect ignitor wiring at 2 circuit plug.

5. Disconnect and label wires from rollout switch.

6. Disconnect and label flame sensor wire.

7. Disconnect and label ground wire from burner/manifold

assembly.

8. Remove four screws that secures burner/manifold

assembly to vestibule. Remove the assembly and make

note not to allow ignitor plate to dislodge from the

assembly.

9. Gently clean the face of the burners using the soft brush

attachment on a vacuum cleaner. Visually inspect the

inside of the burners and crossovers for any blockage

caused by foreign matter. Remove any blockage

10. Reinstall the burner/manifold assembly using the existing

four screws. Burners are self aligning to center of

clam shells.

11. Reconnect ground wire.

12. Reconnect flame sensor wire.

13. Reconnect rollout switch wires.

14. Reconnect ignitor wires.

15. Reconnect gas valve wires.

16. Reconnect gas supply line to gas valve.

17. Refer to instructions on verifying gas and electrical

connections when re-establishing supplies.

18. Follow instructions to place furnace in operation. Run

furnace 5 minutes to ensure burners are clean and

operating correctly.

19. Replace heating compartment access panel.

Advertising
This manual is related to the following products: