Allied Air Enterprises WARM AIR GAS FURNACE 92G1UH User Manual

Page 22

Advertising
background image

506724-01

Page 22 of 57

Issue 1108

1. Use transition solvent cement or a sheet metal screw

to secure the intake pipe to the inlet air connector.

2. Route piping to outside of structure. Continue with

installation following instructions given in general guide

lines for piping terminations and in intake and exhaust

piping terminations for direct vent sections. Refer to
Table 5 for pipe sizes.

FIGURE 26

TYPICAL AIR INTAKE PIPE CONNECTIONS

UPFLOW NON−DIRECT

VENT APPLICATIONS

INTAKE

DEBRIS

SCREEN

(Provided)

NOTE − Debris screen and elbow may be rotated, so that
screen may be positioned to face forward or to either side.

FIGURE 27

TYPICAL AIR INTAKE PIPE CONNECTIONS

HORIZONTAL NON−DIRECT VENT APPLICATIONS

(Horizontal Right−Hand Air Discharge Application Shown)

INTAKE

DEBRIS

SCREEN

(Provided)

OR

NOTE − Debris screen may be positioned straight out
(preferred) or with an elbow rotated to face down.

coupling

PVC pipe

Advertising
This manual is related to the following products: