Start−up & performance check list, Line voltage, Unit set up – Allied Air Enterprises WARM AIR GAS FURNACE 92G1UH User Manual

Page 55

Advertising
background image

506724-01

Page 55 of 57

Issue 1108

Start−Up & Performance Check List

Gas Supply Pressure

SUPPLY

AIR

Line Voltage

GAS SUPPLY

Natural Gas

LP Propane Gas

Piping Connections Tight

Leak Tested

1

INTAKE / EXHAUST PIPE

All Joints Primed and Glued

Terminations Installed Properly

Pipes Supported

Condensate Trap Primed / Line Sloped

Heat Cable Installed and Operable (if applicable)

2

2

2

1

Horizontal Pipes Sloped (if applicable)

UNIT SET UP

3

4

Flter

RETURN AIR

Furnace:
Model Number_______________

Serial Number_________________

3

DUCT SYSTEM

SUPPLY AIR DUCT

Sealed

Insulated (if necessary)

RETURN DUCT

Sealed

Filter Installed and Clean

Grilles Unobstructed

4

VOLTAGE CHECK

Supply Voltage _____

Electrical Connections Tight

1