F.2 preparing the new carry handle, Preparing the new carry handle, Image f-2) – Barco CLM R10+ User Manual

Page 214: Image f-3

Advertising
background image

F. Mounting optional Carry handle

A

A

A

B

B

C

Image F-2
Mounting the stacking points

Image F-3
Stacking points mounted

F.2

Preparing the new carry handle

What has to be done?

The back stacking point must be removed before the carry handle can be mounted on the CLM projector. The fixation hole for the
fixation bolt of the carry handle is covered by the stacking point construction.

How to remove the stacking point construction

1. Turn out the 4 bolts, 2 on each side. Be aware that there is a nut for each bolt on the inside of the carry handle. (image F-4)

210

R59770021 CLM R10+ 11/10/2010

Advertising